Mining Engineer Jobs Vacancy At Twiga Cement February 2022
The Government of Tanzania owned 20% of the company shares. Construction of the factory was completed in mid 1966 and the first bag of cement produced in Tanzania came out of the factory at Wazo Hill.
Job Opportunities at Twiga Cement Tanzania 2022
Twiga Cement was established by Cementia Holdings AG of Switzerland in 1959. In 1962, Cementia Holdings AG in collaboration with Tanganyika Development Company (now Tanzania Development Corporation) started to build the cement factory at Wazo Hill in Dar es Salaam. Job Opportunities at Twiga Cement Tanzania
The Government of Tanzania owned 20% of the company shares. Construction of the factory was completed in mid 1966 and the first bag of cement produced in Tanzania came out of the factory at Wazo Hill.
In 1967, the government increased its shares in TPCPLC from 20 % to 50 % and in 1973, the company was nationalized, the government increased its shares to 100 %.
In 1992, the government entered into a joint venture with two foreign companies.
The Management of Tanzania Portland Cement Public Limited Company is inviting applications from ambitious, energetic and performance-driven individuals to fill in the below position.
Position: MINING ENGINEER
Minimum Qualifications:
- Bachelor’s degree in mining/geology engineering or its equivalent
- More than 5 years of experience in mining operations and experience in the cement industry is an added advantage.
- Proficiency in Ms office Application, Microsoft Excel, Word, Outlook and PowerPoint
- Good knowledge of mine planning, application of mining software and industrial topographic and volumetric surveys.
- Critical thinker and problem-solving skills, interpersonal skills, organisation and team player.
Specific Knowledge
- Accuracy, Good Computer Skills, analytical skills, Communication Skills (English), Leadership, Innovative, Cost consciousness, Multi-tasking, Energetic, Analytical skill, Safety knowledge, etc.
Main Duties and Responsibilities:
- Ensure optimum utilization of crusher to meet production target
- Ensure a supply of sufficient crushed raw mix materials for raw mill and cement additives
- Maintain and improve utilization of crushing machines
- Liaise with the Quality control section on the limestone blending and mix ratios for proper raw mills and cement mills feed
- Maintain and submit daily and monthly crushing reports of Raw mix materials
- Ensure OSHA compliance with the company and statutory requirements
- Compliance to HC Group Code of Business Conduct, Compliance Policies and Guidelines
- Perform any other duties as may be assigned by the Supervisor.
- Area of Responsibility: As assigned by the supervisor
Mode of Application:
Application cover letter, detailed CV, e-mail and/or telephone contacts, names and addresses of three (3) referees. DO NOT ATTACH CERTIFICATES. All applications should be clearly marked the position applying and should be addressed to The Director of Human Resources, Tanzania Portland Cement Public Limited Company, P.O. Box 1950, Dar es Salaam. tpcc.recruitment@twigacement.com
Application Deadline: The deadline for application is 11th February 2022. Only shortlisted candidates will be contacted for interviews.